FAIL (the browser should render some flash content, not this).

DATE

PROJECT SCOPE &DESCRIPTION

Amount

SERVICE

CUSTOMER /COUNTRY

STATUS

2011

API 650 Raw Water Storage Tank with 3000 m³

1 pcs

Manufacture

AKSA Energy

TURKEY

Completed

2011

LO Service Tank with capacity of  20 m³

2 pcs

Manufacture

AKSA Energy

TURKEY

Completed

2011

HP-LP Crossover Piping

4 pcs

Manufacture

BGM Eng. /TEÜAŞ

TURKEY

Completed

2011

Cooling Tower Fan Frames and Technologic Parts

 

Manufacture

SPIG / AKSA

 TURKEY

Completed

2010

6 Bar Drain Tank with 9 m³

1 pcs

Manufacture

AKSA Energy

TURKEY

Completed

2010

6 Bar HRSG Blow down Tank with 9 m³

2 pcs

Manufacture

AKSA Energy

TURKEY

Completed

2010

DN 1400 and DN 1600 Flanges

 

Manufacture

AKSA Energy

 TURKEY

Completed

2010

Piping Supports

 

Manufacture

AKSA Energy

 TURKEY

Completed

2010

Auxiliary Equipments

 

Manufacture

AKSA Energy

 TURKEY

Completed

2010

Drain and Blow Down Tank

 

Manufacture

AKSA Energy

 TURKEY

Completed

2010

DN 1200 and DN 1400 Flanges

 

Manufacture

AKSA Energy

 TURKEY

Completed

2010

Stainless Steel Supports

 

Manufacture

AKSA Energy

 TURKEY

Completed

2009

Turbine and Generator for 2 x 2,8 MW

1 set

Erection

Commissioning

YAYLABEL HES

 TURKEY

Completed

2009

200 Tons Radial Cover for 2 x 7 MW

1 set

Manufacture

Erection

KULP 4 HES

 TURKEY

Completed

2009

DN 800-900-2500 Pipe, Elbows and Reductions

 

Manufacture

AKSA Energy

 TURKEY

Completed

2009

Steam Turbine

 

Manufacture

TÜBİTAK

 TURKEY

Completed

2009

Steel Structure

 

Manufacture

Erection

PALMET/DELTA Energy

TURKEY

Completed

2009

ACC

 

Manufacture

Erection

PALMET/DELTA Energy

TURKEY

Completed

2009

Last Stage Attemperator Liner and Pin

 

Manufacture

AKSA Energy

 TURKEY

Completed

2009

Tertiary Piping Material take, Alloy Steel Attachment

 

Manufacture

AKSA Energy

 TURKEY

Completed

2009

Steam Turbine Anchorage

 

Manufacture

AKSA Energy

 TURKEY

Completed

2008

Turbine and Generator for 2 x 7 MW

 

Erection

Commissioning

KULP 4 HES

 TURKEY

Completed

2008

Turbine and Generator for 2 x 12 MW

 

Erection

Commissioning

KULP 1 HES

 TURKEY

Completed

2008

400 Ton Radial Cover for 2 x 12 MW

 

Manufacture

Erection

KULP 1 HES

 TURKEY

Completed

2008

Stainless Steel Cover

 

Manufacture

DERİNER HEPP

TURKEY

Completed

2007

5 Bar Condense Tank with 3 m³

1 pcs

Manufacture

DELTA Energy

TURKEY

Completed

2006

40 Bar Nitrogen Gas Tank with 100 m³

2 pcs

Manufacture

İÇDAŞ A.Ş.

 TURKEY

Completed

2006

30 Bar Oxygen Gas Tank with 100 m³

6 pcs

Manufacture

İÇDAŞ A.Ş.

 TURKEY

Completed

2006

40 Bar Oxygen Gas Tank with 100 m³

6 pcs

Manufacture

İÇDAŞ A.Ş.

 TURKEY

Completed

2006

5 Bar Sand Filter Tank with 5 / 10 / 15 m³

25 pcs

Manufacture

ARTAŞ A.Ş.

 TURKEY

Completed

2005

API 650 Demineralized Water Tank with 100 m3

1 pcs

Manufacture

EREN Energy

TURKEY

Completed

1990

API 650 Chemical Disposal Storage Tank with 2000 m³

5 pcs

Manufacture

KORUMA TARIM

 TURKEY

Completed

1989

API 650 Chemical Disposal Storage Tank with 1000 m³

5 pcs

Manufacture

KORUMA TARIM

 TURKEY

Completed